+420 731 444 295 oto.dolezal@mmgr-sruby.cz Financing For municipalities Carpentry School
Request a quote

Turnkey log and
glulam houses

We design it, make it in our own workshop and build a home for the rest of your life, at a fixed price and with a clear handover date.

Made in-house·Fixed price·10-year warranty
25+years in business
300+completed projects
100%in-house production
10-yearwarranty

Three ways to your own timber home

A home for year-round living, a traditional glulam house or something for the garden. Whichever you choose, we design it around your plot and the family who’ll live there.

Log house under construction, made in our own workshop

Your whole house, made in one workshop

One team takes responsibility for your house, from design to assembly. You know exactly who’s working on it, and you have one point of contact for every question.

01

Made in-house

We shape every beam ourselves in our Těptín workshop and check the quality at every step, from sawn timber to the last joint. No subcontractors.

02

Timber we stand behind

We build with winter-felled softwood: pine, larch and cedar for our log houses, spruce and fir for our glulam beams. We pick the material piece by piece.

03

Dates you can count on

You’ll get the schedule when you sign the contract, and we plan production so that assembly starts on the agreed day.

04

Warranty and aftercare

The structure comes with a 10-year warranty. We’re still here after handover, with advice on looking after your house.

Homes we’ve already built

More than 300 houses across the Czech Republic. See them on their own plots, with the families who live in them.

From first meeting to moving in

The whole build usually takes 11 to 20 weeks, and at every stage you’ll know what’s happening and what comes next.

Read the full building guide
01

Consultation

1-2 weeks

We’ll talk through your plot, your budget and how you’d like to live, at our show house if you like.

02

Design and quote

2-4 weeks

We draw up the design and a fixed-price budget, so you’ll see every cost up front.

03

Production

6-10 weeks

We make the house in our workshop while you get the foundation slab and utility connections ready. We’ll advise you on both.

04

Turnkey assembly

2-4 weeks

We assemble and finish the house on your plot, walk through it with you and then hand over the keys.

Read the full building guide
Interior of the show house with a tiled stove
360°

Walk through a log house before we build yours

Explore our show house in Těptín room by room without leaving home. If you’d like to see it in person, just arrange a visit.

What the people living in our houses say

“From the very first meeting we knew who we were dealing with and what it would cost. The price didn’t change during the build, and the log house was finished on exactly the date they’d promised us back in the spring.”
Jana and Petr NovákLog house · Central Bohemian Region
“What mattered most to us with our glulam house were the details: the corner joints and the windows. The carpenters took real pride in them, and to this day every visitor stops to look at the beams.”
Martin DvořákGlulam house · Vysočina
“The gazebo was up in three days, roof and all. The crew were well organised, worked tidily and cleared up after themselves down to the last scrap.”
Lucie KrálováGazebo · Prague-East

Before you start building

All advice articles
All advice articles

Your most common questions

More answers in our advice section
Rather talk it through in person?

Call us on weekdays between 8 am and 5 pm.

+420 731 444 295
More answers in our advice section
Finished log house in a garden

Let’s build
yours next

We’ll get back to you within 48 hours.